The roofers are supposed to be back toward the end of next week to roof the two sheds. That means I have a ton of shit to move. The store bought shed has to have the two studs closest to the corner replaced, so that section will have to be cleared. The other shed has no roof now, but it's got all sorts of crap in it, just covered with tarps. They will need to get to the center ridgeline. Lumber, tables, chairs, etc, etc will have to go outside. Not sure what the plan is yet, but I'll figure something out.