if it were me, i'd do it a bit differently since you have 10 ft ceiling
put the totes up on cinder blocks, and use bulkheads in the center of each tote., then put your inline underneath the totes.
the center bulkhead would help keep roots out vs on the side of the totes
and you could run a small drain off the 1.5 pvc to a floor drain if you have one nearby. flip a valve, and that thing would drain in a few minutes