CyberSecks
Active Member
hey guys im doing a flood and drain on a 2x4 table with inch holes and i think its quater inch nozzles. the problem is i ran the pump for 15 minutes and the drain wasnt keeping up with the flooding so i overflowed my table.
seemed like that shouldnt have happened but this is my first flood and drain
any ideas?
seemed like that shouldnt have happened but this is my first flood and drain
any ideas?