hey busakiller i looked up a timer for you C.A.P inc (You can get them through bgws.com makes a 240v 30 amp sub-panel for 4 1000w lights with trigger timer have fun doing the same thing i am new breaker/ expensive cable/ expensive sub-panel
green air products and C.A.P inc makes a sub-panel with a timer trigger for 8 lights on a 50 amp with 2 /10 amp plugs on there too. its pretty cool just about 400.00us and pissing me off that i have to put a new breaker in and run cable . i looked it up and for 240v 3#4+1#8 cable and 50'(about...
about that 240v 30amp? i need 240v 50 amp i have the sub-panel just need tips onwiring the 50 amp breaker and to a outlet then was going to run 50' of ? wire extention cord from new 240 50 out let to new sub-panel for 8 lights please give help on installation of new breaker to outlet
F@$K i really didnt want to post here pleae pm me if possiably dont want to die installing this 240 50 amp sub-panel please hit me up asap any one only person with a brain no friging guessing