Now you can cut the 1/2" clear tubbing to size and put it onto the 90's, now ya got a simple water level gauge (mark the full and fill spots with a black marker when the cloner is finished)
and thats all thats too the Jug it's self.... not too bad eh!
now it time to get onto the 1/2" tube runs and get the sprayer system all cut, setup and put in place....
I just bought 10' of the black 1/2" tubbing to make sure i had enough, had like 2' left after screw ups.... i used 3 long runs conected together, mesured it all to stay 2" min from all sides of the Jug's inside......
I just very simply put a "T" in the center of the center run for the pump connect, the pump will hold it up, the tube between the pump and mister run is 3"...